2021 Water and Power Update!
Construction of the VIP toilets is completed and the water purification system has been installed. Recent photos of these projects can be seen in the link below.
The Ugandan government has begun to connect Mawuuki to the national power grid. Power poles have been installed throughout the SJA campus. Work has begun with the electricians to ensure that each building is properly wired and that the power level is adequate to operate school equipment. Electricity significantly improves the opportunities for the school and the surrounding community.